IUOVA Logo

    Global Product Design & Industrial Design Studio, Mumbai, India

    Paisley
    All Prototypes
    Pedestal FanElectronic
    16 Days•Polycap

    Paisley prototype

    Project Overview

    To transform a conventional pedestal fan into a functional design statement that seamlessly integrates comfort, utility, and aesthetics, making it a visible and valued part of modern living spaces.

    Project Details

    ClientPolycap
    IndustryPedestal Fan
    TypeElectronic
    MaterialsPlastic
    Timeline16 Days
    Engineering & Fabrication Notes

    Brief, Materials, Process & Validation

    Project Brief

    Design Scope & Functional Targets

    The Paisley prototype project was commissioned to evaluate industrial design ergonomics, aesthetic proportions, and mechanical assembly feasibility before high-volume tooling. The brief specified an elevated brand aesthetic, intuitive operator touchpoints, and structural ribbing engineered for production manufacturability.

    Materials & CMF

    Engineering Materials & Surface Finishes

    Fabricated using production-intent engineering materials: Plastic. Key structural enclosures utilize vacuum-cast flame-retardant polyurethanes with custom CMF satin finishes, paired with precision CNC-machined metal fasteners and wear-resistant bushing inserts.

    Fabrication Process

    Model Making & Rapid Tooling Workflow

    The prototyping process utilized high-precision stereolithography (SLA) 3D master prints for dimensional fit checks, followed by room-temperature vulcanizing (RTV) silicone tooling. Parts were vacuum-cast to achieve uniform wall thickness and sharp character lines, followed by hand-sanding, priming, custom metallic CMF painting, and UV-cured topcoat.

    Test Notes & Validation

    Quality Benchmarking & Ergonomics

    Validation protocols included mechanical drop and vibration testing, continuous duty-cycle thermal airflow logging, parting line alignment checks under simulated operating loads, and tactile feedback evaluation across targeted user cohorts to confirm production readiness.

    The Challenge

    What We Set Out to Solve

    Introducing Organic Geometry while ensuring manufacturability and dimensional accuracy. Seamless Integration of Multiple Functions including fan, lighting, and storage within a unified form. Ensuring Structural Stability, Electrical Safety, and Premium Surface Finish without compromising design intent.

    The Solution

    How We Approached It

    Modular internal architecture enabling seamless integration of fan, lighting, and storage systems. Dedicated internal wiring channels with insulation and compliance-driven routing validated at RPT stage. Load-bearing internal structure with optimized weight distribution and reinforced base.

    Paisley hero
    Paisley detail 2
    Paisley detail 3
    Development Journey

    From Concept to Completion

    The complete prototype development journey for this project.

    Phase 1

    SLA-ABS RPT – 3D Printing

    Prototype parts are 3D printed using ABS-like material based on the final design.This stage creates accurate parts for size, fit, and overall evaluation.

    5 Days
    Phase 2

    Post Processing

    Printed parts are cleaned and support material is removed.  Surfaces are refined to achieve a smooth finish before painting.

    7 Days
    Phase 3

    Final Painting & Surface Treatment

    Parts are painted to match the required color and surface finish. Surface treatment enhances appearance and visual quality.

    3 Days
    Phase 4

    Assembly

    All finished parts are assembled into a complete prototype. Final checks are done to ensure proper fit and alignment. 

    1 Days

    Ready to Build Your Prototype?

    Let's discuss your project and bring your vision to life with precision manufacturing.